TRAFFIC IMPACT ASSESSMENT CONSULTANTs

SPECIALIST assessment for traffic in australia

FOR ADVICE OR HELP WITH YOUR PROJECT PLEASE CALL +61 490 780 416

For most planning permit applications, the local highway authorities, local councils or other state authorities, will request a Traffic Impact Assessment (TIA) or Traffic Report, mainly when a proposed development is expected to generate traffic that potentially may have an impact on the existing or future operations on the local highway network, parking areas, intersections, minor accesses, pedestrian/cyclists movements etc.

The TIA aims to provide authorities, and the community with a thorough understanding of how the proposed development will influence transportation in the surrounding area. This information is crucial for making informed decisions about the development's approval and ensuring that any necessary improvements or mitigations are implemented. The specific requirements for a TIA can vary by district and the scale of the proposed development.

The content within the TIA should demonstrate through traffic modelling (SIDRA, TRANSYT, VISSIM) how the development will affect traffic, safety, and accessibility in the area.

As part of the TIA, it may be required a parking demand and occupancy survey be undertaken to understand the availability of on and off-street parking available in the area to potentially accommodate any excess parking demand associated with the proposed development.

Key components of a Traffic Impact Assessment may include:

Traffic Generation: Estimating the expected increase in vehicular and pedestrian traffic resulting from the proposed development.
Intersection Analysis: Evaluating the impact on nearby intersections using modelling software i.e. TRANSYT, SIDRA, VISSIM, including assessing the need for modifications to accommodate increased traffic.
Parking Analysis: Assessing the parking needs of the development and proposing solutions to ensure adequate parking spaces.
Road Network Analysis: Analysing the impact on the local road network, including potential congestion points and suggested improvements.
Public Transport Considerations: Evaluating the impact on public transport facilities and services, if applicable.
Pedestrian and Cyclist Considerations: Addressing the impact on pedestrian and cyclist movements, including the provision of appropriate pathways and crossings.
Safety Assessment: Identifying potential safety hazards and proposing measures to mitigate risks.
Future Growth Considerations: Anticipating the impact of future growth on the transportation network in the area.

Our team at Ayen Consulting has provided a wide range of well-received TIA’s on behalf of clients through their associated Architect, Town Planner Consultant or Building Design Contractor.

Located 20 minutes from Avalon International Airport, Victoria, we provide assessments for a variety of sites including retail, commercial, industrial, residential, schools, universities and hospitals around Victoria, New South Wales, Perth, Northern Territory and Tasmania.

If you require a Traffic Impact Assessment as part of a planning permit submission or other projects, please contact us at the following link or call +61 490 780 416.

CONTACT US FOR A QUOTE OR MORE INFORMATION

DETAILS

Australian Business Number (ABN): 93 673 484 047

Address: Ayen Consulting Pty Ltd, 1280 Geelong-Ballan Rd, Anakie VIC 3221, Australia

Phone: +61 490 780 416

OUR DETAILS